Real results from real businesses - see how we've helped our clients succeed
Metaltech, a mid-size metal fabrication facility, was facing rising electricity costs that were significantly impacting their profitability. With energy-intensive machinery running multiple shifts, their monthly utility bills exceeded $35,000. They needed a solution that would provide long-term cost stability while supporting their corporate sustainability goals.
We designed and installed an 850 kWp rooftop solar system utilizing 2,125 high-efficiency 400W solar panels. The system includes string inverters with integrated monitoring and a sophisticated racking system engineered to withstand industrial vibrations and local wind loads.
Of electricity demand met by solar
Annual energy cost savings
Payback period
Tons CO2 avoided annually
"The solar installation has exceeded our expectations. Not only are we saving significantly on energy costs, but our production team has also noticed improved working conditions due to the thermal insulation effect of the panels. AM Energy Services managed the entire project professionally and completed it ahead of schedule."
— James Rodriguez, Operations Director, Metaltech
TransLog operates a 500,000 sq ft distribution center with refrigerated storage, extensive conveyor systems, and 24/7 operations. Despite implementing various energy-saving measures over the years, management suspected significant inefficiencies remained but lacked detailed data to identify them.
We conducted a comprehensive Level 2 energy audit, installing temporary sub-meters throughout the facility to capture granular consumption data. Based on our findings, we implemented our cloud-based Energy Management System with 45 monitoring points across lighting, HVAC, refrigeration, and material handling systems.
Reduction in energy costs
Annual savings achieved
Payback period
Certification obtained
"The EMS has transformed how we manage energy. We now have complete visibility into our consumption patterns and can quickly identify and address anomalies. The system has paid for itself several times over, and we continue to find new optimization opportunities."
— Patricia Chen, Facilities Manager, TransLog
The Skyline Office Complex, a 12-story Class A office building with 150,000 sq ft of leasable space, was using outdated fluorescent lighting throughout. Tenants complained about poor light quality, maintenance costs for lamp replacement were high, and the building was falling behind newer competition in terms of amenities and sustainability features.
We replaced 2,400 lighting fixtures with high-efficiency LED alternatives and implemented a wireless lighting control system. The project was executed in phases over 8 weeks during off-hours to minimize tenant disruption.
Reduction in lighting energy
Annual savings
Reduction in maintenance calls
Tenant satisfaction rating
"The lighting upgrade was a game-changer for our building. Tenants love the improved lighting quality and control, and we've significantly improved our ENERGY STAR score. The project was completed on time and on budget, with minimal disruption to our tenants."
— Michael Thompson, Property Manager, Skyline Properties
Reduced energy costs by $380K annually through HVAC optimization, solar installation, and lighting upgrades. Achieved LEED Gold certification.
Implemented advanced cooling management system reducing PUE from 1.8 to 1.3, saving $520K annually in a 2MW facility.
1.2 MWp solar array with 500 kWh battery storage. Provides backup power for critical buildings and demand charge management.
Optimized compressed air, refrigeration, and steam systems. Achieved 31% energy reduction and $290K annual savings.
Standardized lighting and energy monitoring across all locations. Total savings: $425K annually with 3.2-year payback.
Implemented load management and battery storage system, reducing demand charges by 42% and saving $340K annually.