Featured Projects

Real results from real businesses - see how we've helped our clients succeed

Metaltech Manufacturing Plant

Solar Photovoltaic 850 kWp Completed 2024

Challenge

Metaltech, a mid-size metal fabrication facility, was facing rising electricity costs that were significantly impacting their profitability. With energy-intensive machinery running multiple shifts, their monthly utility bills exceeded $35,000. They needed a solution that would provide long-term cost stability while supporting their corporate sustainability goals.

Solution

We designed and installed an 850 kWp rooftop solar system utilizing 2,125 high-efficiency 400W solar panels. The system includes string inverters with integrated monitoring and a sophisticated racking system engineered to withstand industrial vibrations and local wind loads.

Results

65%

Of electricity demand met by solar

$260K

Annual energy cost savings

6.5 years

Payback period

1,100

Tons CO2 avoided annually

"The solar installation has exceeded our expectations. Not only are we saving significantly on energy costs, but our production team has also noticed improved working conditions due to the thermal insulation effect of the panels. AM Energy Services managed the entire project professionally and completed it ahead of schedule."

— James Rodriguez, Operations Director, Metaltech

TransLog Logistics Center

Energy Audit EMS Implementation Completed 2023

Challenge

TransLog operates a 500,000 sq ft distribution center with refrigerated storage, extensive conveyor systems, and 24/7 operations. Despite implementing various energy-saving measures over the years, management suspected significant inefficiencies remained but lacked detailed data to identify them.

Solution

We conducted a comprehensive Level 2 energy audit, installing temporary sub-meters throughout the facility to capture granular consumption data. Based on our findings, we implemented our cloud-based Energy Management System with 45 monitoring points across lighting, HVAC, refrigeration, and material handling systems.

Key Improvements Identified & Implemented

  • Refrigeration system optimization with variable frequency drives
  • Lighting retrofit to LED with occupancy sensors in low-traffic areas
  • HVAC scheduling aligned with actual occupancy patterns
  • Demand response program enrollment for peak shaving
  • Conveyor system idle-time reduction protocols

Results

28%

Reduction in energy costs

$420K

Annual savings achieved

2.8 years

Payback period

ISO 50001

Certification obtained

"The EMS has transformed how we manage energy. We now have complete visibility into our consumption patterns and can quickly identify and address anomalies. The system has paid for itself several times over, and we continue to find new optimization opportunities."

— Patricia Chen, Facilities Manager, TransLog

Skyline Office Complex

LED Retrofit Smart Controls Completed 2023

Challenge

The Skyline Office Complex, a 12-story Class A office building with 150,000 sq ft of leasable space, was using outdated fluorescent lighting throughout. Tenants complained about poor light quality, maintenance costs for lamp replacement were high, and the building was falling behind newer competition in terms of amenities and sustainability features.

Solution

We replaced 2,400 lighting fixtures with high-efficiency LED alternatives and implemented a wireless lighting control system. The project was executed in phases over 8 weeks during off-hours to minimize tenant disruption.

System Features

  • LED panel lights with tunable white capability (3000K-5000K)
  • Occupancy sensors in private offices and conference rooms
  • Daylight harvesting sensors for perimeter zones
  • Wireless mesh network for easy reconfiguration
  • Tenant app for personalized lighting control
  • Central management dashboard for facility team

Results

72%

Reduction in lighting energy

$85K

Annual savings

90%

Reduction in maintenance calls

95%

Tenant satisfaction rating

"The lighting upgrade was a game-changer for our building. Tenants love the improved lighting quality and control, and we've significantly improved our ENERGY STAR score. The project was completed on time and on budget, with minimal disruption to our tenants."

— Michael Thompson, Property Manager, Skyline Properties

More Success Stories

Riverside Hospital

Comprehensive Energy Program • 2024

Reduced energy costs by $380K annually through HVAC optimization, solar installation, and lighting upgrades. Achieved LEED Gold certification.

TechCorp Data Center

Cooling Optimization • 2023

Implemented advanced cooling management system reducing PUE from 1.8 to 1.3, saving $520K annually in a 2MW facility.

University Campus

Solar + Battery Storage • 2022

1.2 MWp solar array with 500 kWh battery storage. Provides backup power for critical buildings and demand charge management.

Food Processing Plant

Process Optimization • 2022

Optimized compressed air, refrigeration, and steam systems. Achieved 31% energy reduction and $290K annual savings.

Retail Chain (15 locations)

LED + EMS Rollout • 2023-2024

Standardized lighting and energy monitoring across all locations. Total savings: $425K annually with 3.2-year payback.

Automotive Assembly

Peak Demand Management • 2023

Implemented load management and battery storage system, reducing demand charges by 42% and saving $340K annually.

Cumulative Impact

$28M
Total Client Savings
45 GWh
Energy Saved Annually
18,000
Tons CO2 Avoided

Ready to Start Your Energy Transformation?

Let's discuss how we can achieve similar results for your facility.